EMCOR Engineering Services provided the mechanical and electrical services installation to the Sciences Complex at the University of Sunderland Campus. The complex consists of four separate buildings joined at the first floor by link bridges. The four buildings are identified as Darwin, Dale, Pasteur, (each with two floors & plant rooms), and Fleming (three floors & plant room).
The project included the refurbishment of the existing teaching and laboratory spaces and extensive external landscaping to create a centre-piece outdoor relaxation venue. This involved the complete renewal of the existing mechanical, electrical, plumbing installations including fume cupboards and associated ventilation, specialist gases, drainage and new boiler plant.
SCOPE OF WORK
EMCOR Engineering Services provided the following specialist services:
- LTHW heating
- Ventilation
- Comfort cooling
- Domestic hot & cold water services
- Natural gas installation
- Specialist gases installation
- Fume cupboards
- Air termination network
- Disabled alarm systems
- Induction loop
- LV distribution
- Containment systems
- Lighting and small power
- CCTV and security systems
- Fire alarm
- Lighting protection
- Data and telecoms
- Access control
- External lighting
BACKGROUND
Following the successful completion of both the City Space and City Studio schemes, the Sciences Complex is the third project successfully delivered by Morgan Sindall and EMCOR Engineering Services for the University of Sunderland as part of their ongoing campus redevelopment.
OBJECTIVES
The Sciences Complex was run as a ‘Perfect Delivery’ project by the Principal Contractor and all specialist contractors used the four cornerstones; ‘On Time’, ‘Delighted Client’, ‘Snag Free’ and ‘completed O&M Manuals’, to focus and drive the project to its successful conclusion.
SOLUTIONS
Following the successful completion of the Campus City Space project, EMCOR Engineering Services were re-employed to work closely with both the universities and main contractors design and construction teams at a very early stage. This aided in ensuring that both the cost plan and design were managed robustly and that the very challenging build programme was met.
The client expressed their delight with the installation which can be seen on our Customer Care Reports.
“Its been a great team and we wouldn’t be where we are today without you.”
-Keith Porter, Project Manager, Morgan Sindall
“You worked very well, if it wasn’t for your team being so proactive we wouldn’t be where we are now.”
-Martin Shaw, Project Manager, University of Sunderland
This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries ("EMCOR"). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request.
Copyright 2004, EMCOR Group, Inc., All Rights Reserved


| |
1 Thameside Centre, Kew Bridge Road
Kew Bridge, Middlesex
England TW8 0HF
T: 0845 600 2300 F: 0800 066 4801 |
|